San Francisco |
||||||||||||||||
|
Project Challenges Due to the tight time schedules on some of the projects, the Article 22A compliance projects were frequently conducted based on the conceptual designs and while the detailed designs were being developed by the Port. AEW worked with the Port's design team to identify the potential lateral and vertical extents of areas where soil disturbance activities might occur for the projects. Because of the uncertainty of where the areas would be disturbed, AEW designed the investigation protocols to maximize the coverage of potential horizontal and vertical extents of soil disturbance to minimize additional needs of characterization once the final design is completed. |
|||||||||||||||